Tuesday, November 16, 2010

Measuring Packet and Block Diagram Draft Version

Your completed measuring packet with scale drawing and area calculations and your block diagram draft version are due Thursday the 18th for B Class; Monday the 22nd for D Class

Typical Area Sizes

Tuesday, November 9, 2010

Tuesday, November 2, 2010

Power Point on Program; Furniture Inventory; Adjacency Studies and Bubble Diagrams

Homework: Bubble Diagram

Complete your final version bubble diagram due Friday the 5th of November for B class; Tuesday the 9th for D class. Directions are below:

Part A. Create an artistic quality final copy of your bubble diagram. 
Directions:   
Re-draw a final copy on the drawing paper provided. Title with:
Bubble Diagram for YOUR PROJECT TITLE
Your first and last name;
Date

-Draw in pencil on the drawing paper provided to you; then ink over with a thin Sharpie marker or a Sharpie pen. Use a compass if you have trouble drawing circles.

-Make sure to label the rooms neatly in capitol letters

-Refer to your adjacency study to draw lines to show the connection links between the different rooms
3 lines equaling a critical connection
2 lines equaling some connection
1 line equaling no connection

-Color with colored pencils, creating a color for each of the categories below. Make sure to create a key to tell what colors equal what category.
Public Space
Private Space
Workspace
Storage